VOLUME
45,000m3 Concrete
Whittens was contracted by Zenviron to construct 75 wind turbine generator foundations for the Sapphire Wind Farm Project.
The Sapphire Wind Farm civil concrete construction scope of works included:
- Placement of ~45,000m3 of structural concrete for 75 wind turbine generator (WTG) foundations.
- 600m3 concrete and 60T reinforcement per foundation.
- Approximately 4,450 tonnes of steel reinforcement was used, with 300 quarter anchor bolts assembled onsite comprising 16,800 bolts