Eastern Ridge Services

LOCATION
Newman, WA

CLIENT
BHP

VALUE
$3M

COMPLETION DATE
June 2020

VOLUME

Whittens was engaged to supply and install HV standpipes for Eastern Ridge to improve water supply to BHP’s Mining operations at OB24 and OB25. The scope of works included:

  • 500kL raw water tank with piping, valves, solar control with telemetry and PLC integration.
  • Solenoid control valves, 2 x HV pump and standpipe.
  • 3 km of DN315 HDPE piping with steel piping manifolds.
  • Full package execution including civil, structural, mechanical, electrical and piping.